BFF capabilities by the numbers.
Each BFF factory is designed so that tenants can commence operations immediately from the first day of handover.
BFF was founded by a team with over two decades of experience in industrial real estate development and supply chain operations in Southeast Asia.
Each project is granted full legal construction permits, fire safety certification, and environmental impact assessments—qualifying businesses to apply for manufacturing licenses as soon as the lease is signed.
Three things BFF
is committed to delivering.
A high-quality factory for lease requires a strategic location, international technical standards, and flexibility in lease terms—three factors that BFF considers essential conditions.
Strategic location within industrial zones.
Tan Binh Industrial Zone—a logistics hub in Southern HCMC, offering convenient connections to Tan Son Nhat Airport, Cat Lai Port, and the regional highway network.
- ~ 5 km to Tan Son Nhat Airport
- ~ 18 km to Cat Lai Port
- ~ 8 km to HCMC — Long Thanh Expressway
International standards for FDI clients.
Floor load capacity of 2 tons/m², high clear heights, international standard fire protection, and industrial 3-phase power systems—meeting the rigorous requirements of manufacturing enterprises.
- Floor load 2 tons/m²
- International standard fire protection
- Industrial 3-phase power ready
Flexible leasing based on demand.
Units divisible from 500 m² or full block leases. Flexible contracts tailored to the business type and investment timeline of the tenant.
- From 500 m² or full block lease
- Flexible contracts based on demand
- Suitable for manufacturing, logistics, and R&D
BFF Factory & Warehouse
Ready-to-operate factories in the heart of Tan Binh Industrial Zone.
BFF Factory & Warehouse
Phase 2 project
Portfolio expansion
The logistics hub
of the South.
Lot III-19, Street No. 13
Tan Binh Industrial Zone, Ho Chi Minh City
News &
construction progress.
The new wave of FDI and the thirst for ready-built factories in the South
FDI inflows continue to pour into Vietnam, driving a rapid increase in demand for international-standard factory rentals — while the supply of ready-built facilities in key Southern industrial zones has yet to keep pace.
Construction Progress Update: BFF Factory & Warehouse — May 2026
The construction team has completed the bored piles and begun erecting the 24-meter span structural frames. Current progress is two weeks ahead of the original schedule.
BFF announces the 2026 Design Standards for Factories for Lease
BFF's 2026 Factory Design Standards: 2 tons/m² floor loading, 12m clear height, 1×1500kVA electrical system with backup power — meeting the stringent requirements of FDI tenants.
Schedule a site visit.
Within 24 hours.
Send us your preliminary requirements—the BFF business development team will respond within 24 business hours with a technical brochure and a lease proposal.
Quick Contact Form
Response within 24 business hours · No spam · Information secured